We simplified the timing setup when we installed the new High Voltage power supply. The prevent circuit has been removed, the Thyratrons were triggered directly by the signal pulses from SRS DG-535. The repetition rate was decreased by 0.2 Hz for Prometheus, the 4 channels were set as A=T+1 ms, B=A-1.75 us, C=B+30 ns, D=A-1.21 us.
No comments:
Post a Comment