Randy and John came to help for maintaining the Prometheus. They brought the scanned and clean schematics of the system.
We also changed the old system, this time the ground is connected by the copper sheet, which will provide a good grouding for the Prometheus. Randy and I discussed to try running the X-ray anode without the SCR controller, which would simplify the control system, we will test it tomorrow.
No comments:
Post a Comment