Ultrafast High Intensity Laser
Friday, October 06, 2006
Relay K4 on South side replaced
After running one hour, the Prometheus system was shut down. The Filament light was on and the south bank was totally off. The system was recovered just after changing the relay K4, which is the
power
controller.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment